CAPEX & projects

Laboratory configuration, not a fixed bill of quantities

Define the laboratory, confirm the specification and review a configuration built around the operating environment.

Local accountability

International product access

Products selected against application, method and operational need.

Procurement discipline

A structured pathway that protects laboratory continuity

01

Requirement definition

Scope, users, methods, throughput, utilities and constraints are captured before product selection.

02

Specification

Critical parameters are separated from preferences so the quotation can be reviewed technically.

03

Sourcing

Multi-brand routes are compared against specification, documentation and support requirements.

04

Delivery & lifecycle

Delivery coordination, installation pathways, spares, consumables and recurring supply.

Illustrative configurations

CAPEX pathways organised by operating environment

CAPEX cards are illustrative configurations rather than fixed bills of quantities.

Mine Laboratory
CAPEX / project

Mine Laboratory

Sample preparation, balances, moisture, wet chemistry, water quality and analytical pathways.

Discuss this configuration
Pharmaceutical QC Laboratory
CAPEX / project

Pharmaceutical QC Laboratory

Analytical, microbiology, cold-chain, sterilisation and controlled documentation routes.

Discuss this configuration
Food & Beverage QC Laboratory
CAPEX / project

Food & Beverage QC Laboratory

Moisture, pH, viscosity, microbiology, sampling and release-support workflows.

Discuss this configuration
Water & Environmental Laboratory
CAPEX / project

Water & Environmental Laboratory

Electrochemistry, filtration, turbidity, sampling, standards and field-to-lab continuity.

Discuss this configuration
Academic Teaching Laboratory
CAPEX / project

Academic Teaching Laboratory

Durable teaching equipment, glassware, chemicals, safety and structured practical sets.

Discuss this configuration
Agriculture & Grain Laboratory
CAPEX / project

Agriculture & Grain Laboratory

Grain moisture, sample preparation, balances and quality-control configurations.

Discuss this configuration
Industrial QC Laboratory
CAPEX / project

Industrial QC Laboratory

Physical measurement, process control, analytical chemistry and recurring consumables.

Discuss this configuration
Research Laboratory
CAPEX / project

Research Laboratory

Flexible multi-brand configurations supporting specialised methods and future expansion.

Discuss this configuration
Ready to move

Send the specification. We will identify the sourcing route.

Submit one item, a full schedule or a complete project brief.